Sheffield Digital Campus

Main contractor: GMI Construction

Overall area: 5000m²

Completion: 2008

VISION GLASS

Outer Leaf: 6mm DualTherm ‘HP’ 60/31

Inner Leaf: 6mm Clear Float

U Value: 1.1 W/m²k

SPANDREL PANELS

Outer Leaf: 6mm Clear Float

Inner Leaf: 6mm DualSpan Graphite Ceramic with applied 100mm insulation

U Value: 0.30 W/m²k

D-Campus, Sheffield University